由于选民否决了当地一项为改善多个交通项目提供资金的措施,西南走廊轻轨项目 (Southwest Corridor Light Rail Project) 的设计工作于 2020 年暂停。2022 年初,Metro、TriMet 和联邦交通管理局 (Federal Transit Administration) 完成了最终环境影响声明 (FEIS) 并发布了决策记录 (ROD),以确保该项目未来有资格获得联邦资助。要查看这些文档,请访问 Metro 的项目网站

西南走廊轻轨项目

Portland to Tualatin in 30 Minutes

The Southwest Corridor Light Rail Project is a proposed MAX light rail line that would provide a 30-minute trip between Downtown Portland and Tualatin. The high-capacity transit project was planned for one of the most congested travel corridors in the region, and to support the estimated 400,000 new residents expected by 2040. It would include coordinated investments to foster connected, affordable communities where all people can live, work and thrive.

TriMet, Metro and other project partners began planning efforts on the light rail line in 2009. From 2016-2020, TriMet and Metro worked on the preliminary design and environmental review phases of the project, resulting in the Draft Environmental Impact Statement and the Conceptual Design Report.

In November 2020, voters rejected Measure 26-218 (also known as Get Moving 2020), a proposal to fund the Southwest Corridor Light Rail Project and many other transportation programs across the region.

At this time, planning and design for the project are on hold until funding is identified. A Final Environmental Impact Statement (FEIS) was made available in January 2022 to ensure the project is eligible for future federal funding. See Metro’s project website to learn more about environmental review and to access the FEIS.

The design and alignment concepts shown on this website are based on the Conceptual Design Report, published in September 2020. If the project were to restart at a future date, these designs could change.

TriMet rail system map

The project was based on the Final Conceptual Design Report, published in 2020, and would have included:

 

 

The Route at a Glance

March 2019 preferred alternative
Conceptual rendering subject to change

Route legend

Fly-through

History

拖动时间轴以滚动

2011–2016

2017

2018

2019

2020

2021

2022

2023 年

2024 年

2025 年

2026 年

2027

规划

设计

Draft conceptual design report

Final conceptual design

环境审查

Funding

Voters declined funding measure
November 2020

Planning for Equitable Development

During the planning process, project partners collaborated to minimize gentrification. These efforts included these partnerships:

 