由于选民否决了当地一项为改善多个交通项目提供资金的措施,西南走廊轻轨项目 (Southwest Corridor Light Rail Project) 的设计工作于 2020 年暂停。2022 年初,Metro、TriMet 和联邦交通管理局 (Federal Transit Administration) 完成了最终环境影响声明 (FEIS) 并发布了决策记录 (ROD),以确保该项目未来有资格获得联邦资助。要查看这些文档,请访问 Metro 的项目网站。
53rd Avenue Station is located in the Far Southwest neighborhood off SW 53rd Ave between SW Barbur Blvd and I-5. Adjacent to the wooded slopes of Mt. Sylvania, the station serves the neighborhood and the PCC-Sylvania campus. Complementing walk and bus access to the station, the site includes a proposed surface Park & Ride with up to 310 spaces and improvements on SW 53rd Ave for people walking and biking.
有意见或问题?
请致电 503-962-2150 或发送邮件,了解更多信息。