由于选民否决了当地一项为改善多个交通项目提供资金的措施,西南走廊轻轨项目 (Southwest Corridor Light Rail Project) 的设计工作于 2020 年暂停。2022 年初,Metro、TriMet 和联邦交通管理局 (Federal Transit Administration) 完成了最终环境影响声明 (FEIS) 并发布了决策记录 (ROD),以确保该项目未来有资格获得联邦资助。要查看这些文档,请访问 Metro 的项目网站

Station Access:
Tigard

The Shared Investment Strategy, adopted in 2013 by the project Steering Committee, recommended a narrow list of strategic roadway, bike and pedestrian projects to potentially construct. These station access projects are not in the current project budget but could be designed and built by the project if other funding sources are secured.

There are currently six station access projects identified in the City of Tigard. Projects will be prioritized using public input as well as criteria including safety, equity, proximity and access.

Potential projects

Project numbers correspond to identification in the Environmental Impact Statement.

24 New SW Baylor St sidewalks

25 New SW 72nd Ave sidewalks and bikeway

26 SW Hall Blvd sidewalk improvements

27 Bonita Rd sidewalk and bikeway improvements

28 Carman Dr sidewalk and bikeway improvements

30 Bike and pedestrian connection over Highway 217

station access opportunities map

 

 

有意见或问题?

请致电 503-962-2150 或发送邮件,了解更多信息。

 

 