由于选民否决了当地一项为改善多个交通项目提供资金的措施,西南走廊轻轨项目 (Southwest Corridor Light Rail Project) 的设计工作于 2020 年暂停。2022 年初,Metro、TriMet 和联邦交通管理局 (Federal Transit Administration) 完成了最终环境影响声明 (FEIS) 并发布了决策记录 (ROD),以确保该项目未来有资格获得联邦资助。要查看这些文档,请访问 Metro 的项目网站。
The Shared Investment Strategy, adopted in 2013 by the project Steering Committee, recommended a narrow list of strategic roadway, bike and pedestrian projects to potentially construct. These station access projects are not in the current project budget but could be designed and built by the project if other funding sources are secured.
There is currently one station access project identified in the City of Tualatin.
有意见或问题?
请致电 503-962-2150 或发送邮件,了解更多信息。