由于选民否决了当地一项为改善多个交通项目提供资金的措施,西南走廊轻轨项目 (Southwest Corridor Light Rail Project) 的设计工作于 2020 年暂停。2022 年初,Metro、TriMet 和联邦交通管理局 (Federal Transit Administration) 完成了最终环境影响声明 (FEIS) 并发布了决策记录 (ROD),以确保该项目未来有资格获得联邦资助。要查看这些文档,请访问 Metro 的项目网站

Inner Portland:
Gibbs Street Station

Nestled between the historic Lair Hill neighborhood and the forested West Hills of Terwilliger Parkway, the Gibbs Street Station will provide a critical connection for the thousands of employees, patients and students visiting Marquam Hill every day. Enhanced pedestrian crossings will make it easier for South Portland residents to access Terwilliger Parkway’s natural beauty and expansive views. With a new crossing of SW Naito Pkwy and the Marquam Hill Connector, a pedestrian connection will reach from the South Waterfront to Marquam Hill. These connections will provide direct access to the light rail station, and a new public plaza.

 

Former synagogue building site constraints PDF

Downtown Portland to Marquam Hill map

Downtown Portland to Hamilton Street

 

Conceptual rendering
Subject to change

Gibbs Station cross section

Station overview

Gibbs station overview

Station features

Gibbs Station features

Station cross section

Gibbs Station cross section

益处

Mobility and Connectivity

Mobility & Connectivity

  • Three new and improved pedestrian crossing along SW Barbur Blvd
  • Enhanced pedestrian crossings of SW Barbur Blvd and SW Naito Pkwy at SW Gibbs St intersections, connecting neighborhoods Marquam Hill and South Waterfront
  • Re-designed Barbur-Naito intersection for safer bike and pedestrian mobility
  • Planned connections to bus lines 44, 56 (shared transitway) line 43 on 1st Ave, and lines 54, 96 on SW Naito Pkwy
  • One travel lane retained in each direction along SW Barbur Blvd, north of SW Naito Pkwy
Community

Community

  • Access to Lair Hill, Homestead and South Waterfront neighborhoods, and Marquam Hill destinations
  • Narrowed street section maintains emergency access while minimizing park and historic property impacts
  • Access to Terwilliger Parkway, Duniway and Lair Hill Parks
环境

环境

  • Enhanced street tree canopies and stormwater treatment along SW Barbur Blvd

 

 

有意见或问题?

请致电 503-962-2150 或发送邮件,了解更多信息。

 

 

注册以获取电子邮件更新


项目合作伙伴

TriMet 地铁 ODOT Washington 县 Durham 市 Portland 市 Tigard 市 Tualatin 市