由于选民否决了当地一项为改善多个交通项目提供资金的措施,西南走廊轻轨项目 (Southwest Corridor Light Rail Project) 的设计工作于 2020 年暂停。2022 年初,Metro、TriMet 和联邦交通管理局 (Federal Transit Administration) 完成了最终环境影响声明 (FEIS) 并发布了决策记录 (ROD),以确保该项目未来有资格获得联邦资助。要查看这些文档,请访问 Metro 的项目网站。
Sitting at the intersection of a dense mixed-use center and regional employment hub, Hall Boulevard Station is a critical node for the project. To emphasize bus and WES Commuter Rail transfers, the SW Commercial St transit corridor will be designed for pedestrian comfort and integrate the station into Downtown Tigard. Design elements include bus shelters, landscaping, pavement treatments and wayfinding. Similar pedestrian and bicycle improvements along SW Hall Blvd and SW Hunziker St will help continue to make Tigard one of the most walkable cities in the region.
有意见或问题?
请致电 503-962-2150 或发送邮件,了解更多信息。