由于选民否决了当地一项为改善多个交通项目提供资金的措施,西南走廊轻轨项目 (Southwest Corridor Light Rail Project) 的设计工作于 2020 年暂停。2022 年初,Metro、TriMet 和联邦交通管理局 (Federal Transit Administration) 完成了最终环境影响声明 (FEIS) 并发布了决策记录 (ROD),以确保该项目未来有资格获得联邦资助。要查看这些文档,请访问 Metro 的项目网站

Inner Portland:
Marquam Hill Connector

Marquam Hill, home to numerous health care destinations, residences and supporting businesses, attracts over 18,000 employees, patients, students and residents each day from around the region. To serve this major destination, the Southwest Corridor Light Rail Project will include a connection from the Gibbs Street Station on Barbur Boulevard, up the steep inclines toward Marquam Hill.

The short but steep distance up the wooded terrain requires some combination of pathways and mechanical facilities. In early 2019, a “Green Ribbon” committee (GRC) made up of design professionals, key project partners and Marquam Hill stakeholders, explored a wide variety of connector types including bridges, gondolas, escalators, tunnels and more.

Downtown Portland to Marquam Hill map

Downtown Portland to Marquam Hill

Inclined Elevator

An inclined elevator was selected as the preferred connector choice. Choosing the right connector involved multiple phases of robust public engagement and technical review, including analyzing the effects on Terwilliger Parkway — a historic park resource with Federal, state and local mitigation requirements. Of the different connection options explored, the inclined elevator received the most public support, and was found to have the least impact on Terwilliger Parkway.

An inclined elevator works similar to a standard elevator but provides horizontal and vertical movement. Inclined elevators resemble historic funiculars, found throughout Europe, the US, and Canada, but use modern technology. A contemporary example can be found in Edmonton, Canada.

Two elevator cabs, each with a capacity of 40 people, will run on parallel tracks to efficiently move people up the steep slope toward Marquam Hill. A trip in the elevator will take about 60 seconds.

From the top of the inclined elevator, at Terwilliger Parkway and Campus Drive, an accessible pathway will connect to elevators within the OHSU campus.

Riders will also be able to access Line 8-Jackson Park/NE 15th Ave here, which provides frequent, door-to-door service to many Marquam Hill destinations.

View of Gibbs Station and Marquam Hill Connector

View of Gibbs Station and Marquam Hill Connector

 

Profile and cross section

Cross section

 

Aerial of Connector Location

Aerial of Connector Location

View from Terwilliger

View from Terwilliger

View from funicular

View from funicular

 

 

有意见或问题?

请致电 503-962-2150 或发送邮件,了解更多信息。

 

 

注册以获取电子邮件更新


项目合作伙伴

TriMet 地铁 ODOT Washington 县 Durham 市 Portland 市 Tigard 市 Tualatin 市