由于选民否决了当地一项为改善多个交通项目提供资金的措施,西南走廊轻轨项目 (Southwest Corridor Light Rail Project) 的设计工作于 2020 年暂停。2022 年初,Metro、TriMet 和联邦交通管理局 (Federal Transit Administration) 完成了最终环境影响声明 (FEIS) 并发布了决策记录 (ROD),以确保该项目未来有资格获得联邦资助。要查看这些文档,请访问 Metro 的项目网站。
A 1.6 mile segment of paved trackway, called the shared transitway, is planned between Downtown Portland Hillsdale. This feature accommodates both bus and light rail operations and provides bus routes with access to dedicated transit lanes.
The transitway will allow buses traveling to and from destinations to the west to skip traffic from SW Capitol Highway to the Portland Transit Mall, minimizing congestion and improving travel times and reliability.
An existing example of this feature is the MAX Orange Line’s 1.3-mile shared transitway, which provides access for the bus lines 17 and 9, and the Portland Streetcar approaching Tilikum Crossing, Bridge of the People.