由于选民否决了当地一项为改善多个交通项目提供资金的措施,西南走廊轻轨项目 (Southwest Corridor Light Rail Project) 的设计工作于 2020 年暂停。2022 年初,Metro、TriMet 和联邦交通管理局 (Federal Transit Administration) 完成了最终环境影响声明 (FEIS) 并发布了决策记录 (ROD),以确保该项目未来有资格获得联邦资助。要查看这些文档,请访问 Metro 的项目网站

Overall Project Improvements:
Urban Design Elements

Design elements

Design elements

A great transit system is composed of a number of elements, each of which are distinct and have their own function, and yet need to work together. The project will include both consistent system-wide design elements and unique elements to express local context. Design of these features will take place in the coming years. This page provides some precedent examples that explore how these elements could be expressed.

 

 

Design elements

Precedents

Stormwater Features

The project will include major improvements to help treat the nearly 70 acres of existing impervious surface – all currently unmanaged in the corridor. The project will use a variety of stormwater solutions to mitigate runoff and integrate into existing spaces based on land conditions and context. The stormwater toolkit illustrates the variety of solutions that the project could use.

 

 

Stormwater toolkit

Stormwater toolkit

 

 

有意见或问题?

请致电 503-962-2150 或发送邮件,了解更多信息。

 

 

注册以获取电子邮件更新


项目合作伙伴

TriMet 地铁 ODOT Washington 县 Durham 市 Portland 市 Tigard 市 Tualatin 市